New Transom Windows

Sharing is caring!

[/caption]

Insulation applied on the inside

Then the new naugahyde is applied
Opening is masked off
Clean hull surface with 50:50 denatured alcohol and water and the port light frame with acetone. Make sure to dry both surfaces.

New port light is laid in place and held by tape so not to fall

Attach ring with screws from the inside. Make sure to set tension of screw driver, so as not to strip screws.
Finished port light

Job progresses
All Done!
Cozy inside